Quantcast
Channel: SCN : All Content - All Communities
Viewing all articles
Browse latest Browse all 7846

Problems getting SLED to work with WM

$
0
0

Hello

 

We have a problem regarding SLED and WM it will not pick the correct quant (the quant with the lowest SLED date)

I have looked at several SLED questions here at SCN but none have given me any solutions, still it picks the wrong quant during creation of TO.

I have done the following

 

The materials are batch managed, the SLED is activated in OMKW for the Warehouse, and the Stock removal strategy is set to H for the storagetype we are working with.

The quants we are testing on have different GR dates, and SLED dates, but we are not able to get it to pick the one with least time All are stored in the same bin.  We have added Stock with less SLED and not been able to get the system to pick this. In material master the Min rem shelf time is set to 1 Day. We have also tried to manipulate this to 200, to get it to pick the one quant with 400 days remaining SLED but it does not seem to work at all.

 

Is there any customizing that we have overlooked?

Now it looks like it is picking the same quant until that one is totaly removed, then it picks a new batch and continues until that one is removed. It gives warnings about SLED date if we manipulate material master minimum shelf time to ex 200 days. Then it warnes us about that the picked batch only has fallen short of 188 days as an example.

What can be done to solve this so it picks the correct quants during TO creation?

 

Regards

 

Ivar


Viewing all articles
Browse latest Browse all 7846

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>