Hi all,
I have one business requirement.
Two materials are there A&B .These material are stored in the same storage location. Business needs exclude the storage location stock for material A while run the MRP but it should not any impact for material B.
There are 70000 materials are there to exclude the storage location stock.
Please tell me the process.
Thanks
Manoj