Hello Friends,
I am trying to make a process (DTP load) which has turned RED in the chain to "GREEN", so that the chain will move forward and the status of the whole chain turns GREEN.
I have followed the steps in mentioned in numerous threads, on how to take the details from the Message part of the failed process , check in RSPCPROCESSLOG and then use the parameter in RSPC_PROCESS_FINISH.
When I first run the details in the table, the Status of Process (STATE) show "R" and the Status of Process (ACTUAL STATE) = "".
After I execute the RSPC_PROCESS_FINISH, the Status of Process (STATE) show "G" and the Status of Process (ACTUAL STATE) = "R".
And due to this, the chain proceeds further, but the error node remains "RED".
I have configured RSPCM email messages for failures in chains, due to the fact that the chain is in "RED" status, the email keeps on triggering.
Is this a bug for 7.3. because in earlier version, the node use to turn green. and so does the chain.
I checked for one 1631909 - Chain does not become green or stops at IP for synchron. run
seems to be for IP.failues.
I have tried putting the chain out of schedule and back, and created a fresh new chain, does not seem to matter.
Thanks for your help
Ed.