Hi experts,
We are in SRM 7.0 classic scenario with ECC 6.0. SRM are creating SC with backend contract as source of supply.
1. We select a material from a catalog (MDM) with UOM in material master with value "G"
2. In details /position in the SC, in "supply of source" tag has a contract as a supply of source with UOM "ENV"
3. so the contract has different UOM of the material
4. The SC has taken the UOM from the material (material master ) instead of the contract.
The user cant change the supply of source and he cant change the UOM that is taken the SC
It´s behaviour not always is given. I mean that for some colleagues are determined correctly UOM in the SC and not others when we try to test the incident
Any suggestion?
Thanks in advance.
Best Regards,
Mar